Project

Geological profile and mechanised expansion plan

The BiField Gold Mine Project is located within a historically productive mining region of the Philippines with favourable geological conditions for precious metals extraction.

Overview map of the BiField Gold Mine Project location
Location: 663 hectares between Tagkawayan, Quezon and Labo, Camarines Norte, Philippines.

Geological profile

Economically viable mineralisation confirmed by assay results

The project is located within a historically productive mining region of the Philippines with favourable geological conditions for precious metals extraction.

Independent laboratory assay results from the Philippines Mines and Geosciences Bureau confirm the presence of economically viable mineralisation.

Abstract geological cross section placeholder

Resource metrics

Core project estimates

MetricEstimate
Total Ore Volume15.7M tonnes
Gold Grade~5 g/t
Silver Grade~38 g/t
Contained Gold~78,500 kg
Contained Silver~596,600 kg
Estimated In-Ground Value~USD 12.3B

A full JORC certificate will be produced.

Mine operations

Current artisanal production

The mine is currently operating through small-scale artisanal production methods, extracting gold from an active mineralised vein shared with an adjacent operation.

Existing activity provides operational validation while supporting future expansion planning.

Abstract illustration of a mine portal and geological layers

Mechanised expansion

Primary development strategy

The project’s primary development strategy focuses on transitioning to mechanised mining operations.

  • Increased ore throughput
  • Improved recovery efficiency
  • Lower operating costs
  • More consistent production
  • Scalable long-term operations

The phased expansion model allows for controlled deployment of capital while progressively increasing production capacity.

Tokenisation vision

Future-phase strategic option

As a future development initiative, the project may incorporate a digital asset platform backed exclusively by gold and silver reserves.

The objective would be to provide enhanced liquidity, broader investor accessibility, and long-term asset participation.

This remains a future-phase strategic option and is not part of current mining operations.